Prefabricated modular buildings · Shipped worldwide
Wudoraspace modules arrive finished: wiring, plumbing, fire safety, interiors and a solar roof already fitted. Set one down on a farm, a resort, a hillside or a project site, connect it, and move in. When you need to, lift it and move it again.
Where they go
Each building is a set of steel-framed modules that stack and join. The same system becomes a weekend farmhouse, a row of resort cottages or a 20-desk project office.
Inside every module
The parts that slow a normal site down are done on the factory floor and tested before the module ships.
Interiors
Full-height glazing, warm laminate floors, finished ceilings with concealed lighting. Choose a finish pack and the module leaves the factory furnished.
Order to handover
Your site prep runs at the same time as the factory build, so nothing waits on anything else.
Layout, finish pack, site survey.
DAY 1–3Frame, panels, wiring, plumbing, fire safety, interiors and solar fitted and tested. Your foundation pads are poured in parallel.
DAY 4–20Road, rail or sea freight.
DAY 21–26Craned, joined, connected.
27–29Models & pricing
Prices are starting points for the base finish, ex-factory. Every model can be extended with more modules.
Indicative prices, excluding transport, foundation, local taxes and permits. Final quote after site survey.
Worldwide
Modules are sized to standard ISO container dimensions, so they move on any freight network. Our install crew travels with the order, or we train your local team.
Questions
Simple concrete pads or plinth beams at the module corners, not a full raft. We send the drawing on day 3 so your local contractor can pour while we build.
Yes. Modules unbolt, services disconnect at marked points, and the unit is craned onto a truck. Plan for about a week to relocate a two-module building.
The galvanised steel frame is designed for a 30+ year life. Cladding and finishes are serviceable and replaceable.
Walls and roof use insulated sandwich panels. Climate packs add thicker insulation for cold regions or extra roof shading for hot ones.
Rules differ by country and land use. Many farm and site-office uses are treated as temporary structures. We supply structural and services drawings for your local approval.
The solar roof can be paired with a battery bank, water tank and septic or bio-digester package for fully off-grid sites.
Contact
Share the location, what the building is for and roughly how big. You'll get a layout and an itemised quote within two working days.